Architects
The appointment agreed in writing,before stage one.
Send the terms of appointment and the schedule of services as one pack, get them signed before stage one, and keep a record of what was agreed and when.
Letter of engagement 2026/27
From: R. Hartley, Hartley & Co
The three documents
The third one is where the fee is usually lost.
The terms of appointment
Who the parties are, the scope of the services, the fee or how it is calculated, and who is responsible for what. Agreed in writing before the work begins, and it is the document this product carries.
The schedule of services
Set out by work stage, which is how practices actually work. Each stage appears as its own line, so a client can see what they are committing to at each point instead of a lump sum with a schedule buried in an appendix.
The additional services instruction
Where the fee argument actually happens: a change of brief, a re-design after planning, an extra consultant to coordinate. Send the instruction from the same template and get it signed before the work is done, rather than adding it to the final account and hoping.
Sub-consultant appointments and letters of intent go through the same mechanics if you want them to.
Where this sits in the project
At the very front of it, and nowhere else.
The appointment is the first thing on a project and the one most often handled informally, because everybody is keen to start. Agreed after a dispute has started, it is not an appointment, it is a negotiating position.
This sits at the very front of the project, before stage one. What we carry is the terms, the schedule of services, the additional services instruction, the signature and the evidence around all four. Drawings, consultants and the building contract stay wherever they are today.
Build the appointment once and reuse it
Keep the appointment as a template with your stages, your clauses and your signature blocks already in it: the stages you routinely run, the surveys, the consultant coordination. The next one is a change of scope rather than an evening.
Send it before the work starts, not after
The appointment goes out as one pack: the terms, the schedule of services and anything that has to travel with them. It is signed and dated before the first stage, which is what makes the fee collectable.
Keep what settles the argument
Every send, open and signature is recorded with its time and IP address, and the completed appointment produces a certificate. When a client says two years later that a stage was included, the answer is a document rather than a memory.
Send your next appointment through it.
What settles a fee dispute
The ARB, the UK architects’ regulator, requires the terms of an appointment to be agreed and recorded in writing before any professional service begins, and it has acted on it. The failure is rarely a practice that refuses to write terms. It is a practice that sent them, started work, varied the scope twice by email, and now cannot show which version was agreed. That is an evidence problem, and it is the one this product is built for.
The certificate
Produced automatically when the last signature lands. It lists each signature with its time, actor and IP address, a fingerprint of every document in the appointment, and a QR code linking to an independent check.
Checkable without you
A client, their solicitor or an adjudicator can verify a completed appointment themselves, with no account and no login. It confirms the document, the signers and that the chain is intact, without disclosing what the document said.
Verify a document →CecurSign
Certificate of Completion
- Subject
- Letter of engagement 2026/27
- Created
- 04/06/2026 09:12 UTC
- Sent
- 04/06/2026 09:14 UTC
- Completed
- 05/06/2026 16:41 UTC
Documents
Engagement letter and schedules.pdf (7 pages)
SHA-256: a4f1c9e0b7d3
Signers and recipients
- R. Hartley (Signer)Signed 04/06/2026 11:02 UTC
- J. Okafor (Signer)Signed 05/06/2026 16:41 UTC
Scan to verify
Envelope ID
9c1f2a34-5b6d-4e71-8f90-2ad4c6e13b58
What you would actually be using
The parts of CecurSign that matter to architects, and what each one does here.
Templates
The additional services instruction, kept ready to send the day the scope moves. That document is where the fee argument actually happens, and the usual reason it is lost is that nobody stopped to write one.
Build a document once with its fields, its signers and its reminders, then send it as often as you need without rebuilding it.
Sending for signature
Terms of appointment signed before stage one, which is while it is still an easy conversation, and signed by every party to the appointment rather than by whoever answered the email.
One person or several, in a set order or all at once, with a deadline and a copy to whoever else needs one.
Supporting material
Your fee basis, your professional indemnity position and your obligations under the appointment travel beside it to be read rather than signed, and you can see which the client opened before stage one starts.
The things that are read rather than signed, sent alongside the document instead of stapled into it, with a record of who opened what.
Reminders
An appointment that went out and never came back is chased on its own, so work does not quietly begin on an unagreed fee.
Chases that go out on a set pattern while something is unsigned, a nudge you can send by hand, and a deadline you set yourself.
Certificate of completion
What was agreed, when, and for which stages, produced months later without reconstructing it from an email thread.
Produced when the last signature lands: every signature with its time, the person who made it and their IP address, and a fingerprint of each file.
What practices ask before they buy
Short answers to the four that come up most.
Is an electronically signed appointment legally binding?
Our fees run per work stage. Does that survive on the document?
The brief changes after the appointment is signed. What then?
Does this replace the software we already run the practice on?
More detail on how a document is sent, signed and proved on the e-signature page, or see how other companies use it on the industries index.
How it fits your documents
Send a document for signature, or sign one yourself. This is what each looks like in your line of work.
E-signature
The client reads your terms, your fee basis and your professional obligations beside the appointment, and you know which they opened before stage one starts.
Sending for signatureSelf sign
A planning declaration, a certificate for a client's lender, or a form the council sent as a PDF: signed by you alone, in one sitting, and filed with a record.
Signing something yourselfWhat to read next
The parts of the help centre this page assumes, in the order you would meet them.
- Creating a templateSet up a document you send often, with the fields already in place.
- Sending, and what happens nextWhat we do the moment you press send, and how to follow progress.
- Deadlines and chasing people upSetting an expiry date, what happens when it passes, and how to nudge.
- The certificate of completionThe evidence page attached to every finished document, and how to read it.
Everything else is in the help centre.
Put your next appointment through it
Build one from your own stages, send it to a real client, and look at the certificate that comes back.
No credit card required.